The project is located in Lianyungang City. Entrusted by Lianyungang Xuwei Urban Construction Engineering Co., Ltd., our company undertakes the following work contents: design, construction, acceptance, handover and other work of soft foundation treatment, including engineering design, construction, and safety maintenance design, construction and monitoring of surrounding foundations in soft foundation treatment.
The project started on March 31, 2020 and was completed on October 8, 2021. We completed the laying of 150g/m2 woven geotextile of about 138 million square meters, laying of 200g/m2 non-woven geotextile about 92 million square meters, construction of about 926 million meters of plastic drainage boards, vacuum pipe network connection about 500,000 m , laying sealing film about 158 million m2 , construction of vacuum pre-pressurized shallow layer about 350,000 m2 and deep layer about 390,000 m2 .
In the construction process, the project department strictly implemented the relevant provisions in the compilation of rules and regulations of the owner and the company, strictly organized, scientifically managed, meticulously constructed, fully accepted the supervision of the owner, the supervising engineer and the administrative department, self-inspected and re-inspected the quality, progress and safety of the project, put an end to the flow of unqualified products to the next process, strived for excellence in the work, the test pass rate is 100%, meeting the requirements of the bidding documents and contracts, and meeting the quality standards of the specified acceptance specifications. Occupational health and safety management achieves the goal of "zero" accidents during construction.