The project is located in Shaoguan City, Guangdong Province. Entrusted by SGIS Songshan Co., Ltd., our company undertakes the pile foundation construction of this project.
The project officially started on August 4, 2020, with a completion date of October 15, 2021, which lasted 437 days. Completed 626 piles of work tasks within the contract. Among them, there are 66 φ800mm rotary piles with an average length of 23.31m and 560 Φ600mm bored piles with column with an average length of 16.77m. The pile foundations were tested to be 100% qualified, and the pile integrity and bearing capacity met the design requirements.
During the construction period, the project department actively coordinated with the general contractor, the designer, the owner, the supervisor and other units, and well completed the objectives of various tasks, which was unanimously praised by the owner, the designer and supervision units, and laid a good foundation for the subsequent construction tasks.