The project is located in Wu'an , Handan City, Hebei Province, entrusted by Hebei New Wu'an Iron and Steel Group Xinhui Metallurgy Company Limited, our company was responsible for the construction of a total of 286 concrete piles ( with pile diameter of 800mm and effective pile length of 30.0m-35.0m) for this project.
With the active cooperation of the owner and the efforts of our company, the project was started on November 27, 2021 and completed on April 05, 2022, with an actual effective construction period of 64 days. During the project construction period, the project department actively overcame the external environmental impacts such as the unavailability of concrete at night, the narrow site, and the cooperation with the local epidemic prevention and control department during the epidemic, and successfully completed the construction task by overcoming all difficulties.
The quality acceptance rate of pile foundation of this project is 100%. There is no safety accident and no damage to the environment during the whole construction process, which has met the requirements of the owner for progress, quality, safety and environmental protection, and has been recognized by the owner and has achieved good social benefits.