The pile foundation construction of Hubei Youke Precision Manufacturing Co., Ltd is located in Hubei Huangshi Xingang (Logistics) Industrial Park. A total of more than 1,500 piles were completed, including more than 370 piles with a diameter of 600mm, more than 90 piles with a diameter of 700mm and more than 1,000 piles with a diameter of 800mm. The piles are made of C30 concrete and C40 concrete.
The pile foundation construction project of Hubei Youke Precision Manufacturing Co., Ltd. started on August 23, 2021, and was completed on December 30, 2021, after 130 calendar days of intense construction with the joint efforts of all the staff of the project department and the strong support of the supervisor and the owner, successfully completing the construction task.
More than 1,500 bored piles were tested by the third party, and the qualification rate was 100%.