Soft Foundation Treatment Project EPC project for Part of Lianyungang Petrochemical Industry Base

2/18/2022 5:20:56 PM

The project is located in Lianyungang City. Entrusted by Lianyungang Xuwei Urban Construction Engineering Co., Ltd., our company undertakes the design, construction, acceptance and handover of the soft foundation treatment of the project, including engineering design, construction, and safety maintenance design, construction and monitoring of the surrounding foundation in the soft foundation treatment.

Construction began on March 31, 2020 and was completed on October 8, 2021. Completed the laying of 150 g/㎡ woven geotextile about 1.4 million ㎡, laying 200 g/㎡ non-woven geotextile about 920,000 ㎡, laying plastic drainage board about 9.26 million m, vacuum pipe network connection of about 500,000 m, laying sealing film of about 1.58 million ㎡, vacuum pre-pressure shallow layer of about 350,000 ㎡ and deep layer of about 390,000 ㎡.

In the construction process, our project department strictly implemented the relevant national laws and regulations, standards and contracts, scientific managed, meticulous constructed, strict controlled of project quality, progress and safety, excellence. The testing pass rate is 100%, meeting the bidding documents and contract requirements, and achieving the quality standards of the specified acceptance specifications, and well achieving the goal of "zero" accidents in safe production.

 

Add:NO.555 Huaian Road(west),Shijiazhuang City,Hebei Prov. P.C.:0502271   Tel:0311-66723100 66723200 Fax:0311-66723277  
Copy right:China Hebei Construction & Geotechnical Investigation Group Ltd. 2008