The project is located in Shangqiu City, Henan Province, invested by CLP Shangqiu Minsheng Thermal Power Co., Ltd, and our company is responsible for the construction of pile foundations. The pile foundation is divided into two types, CFG piles and vibro-replacement stone column, of which there are 1,117 CFG piles with a diameter of 500 mm and 194 vibro-replacement stone columns with a diameter of 500 mm..
Construction began on 26 November 2016 and was completed on 27 March 2017. During the construction period, our project department strictly abided by the relevant laws and regulations of the state and the relevant provisions of the owner, designated a special person to be responsible for civilized construction and environmental protection, organized all employees to carry out environmental protection and civilized construction training, conducted regular environmental inspections, corrected problems in time, adhered to civilized construction, strengthened environmental protection, and met the relevant environmental requirements of the state and the owners.
In the face of the complex geological situation at the construction site, tight construction period, poor construction conditions and other unfavorable factors, our project department actively obeyed the unified coordination and arrangement of the owner, scientifically organized and carefully deployed, strictly followed the construction technical steps and measures, and implemented safety and quality at all levels. With the unremitting efforts of all the project personnel, the node goal of the owner was completed with quality and quantity, and was praised by the owner and the supervision unit.